(Ie Beuna) Aftermath of the tsunami in Aceh

The western coastal areas of Aceh, including the cities of Banda Aceh, Calang, and Meulaboh, were among the areas hardest-hit by thetsunami resulting from the magnitude 9.2 Indian Ocean earthquake on 26 December 2004. While estimates vary, over 170,000 people were killed by tsunami in Aceh and about 500,000 were left homeless. The tragedy of the tsunami was further compounded several months later on 28 March 2005 when a second off-shore earthquake measuring 8.6 on the Richter scale struck the sea bed between the islands of Simeulue Island in Aceh and Nias in North Sumatra. This second quake killed a further 1346 people on Nias and Simeulue, displaced tens of thousands more, and caused the tsunami response to be expanded to include Nias. the World Health Organisationestimates a 100% increase in prevalence of mild and moderate mental disorders in Aceh's general population after the tsunami.


The population of Aceh before the December 2004 tsunami was 4,271,000 (2004). The population as of 15 September 2005 was 4,031,589, and at January 2014 was 4,731,705.

As of February 2006, more than a year after the tsunami, a large number of people were still living in barrack-style temporary living centers (TLC) or tents. Reconstruction was visible everywhere, but due to the sheer scale of the disaster, and logistical issues, progress was slow. A study in 2007 estimates 83.6% of the population has psychiatric illness, while 69.8% suffers from severe emotional distress.

The ramifications of the tsunami went beyond the immediate impact to the lives and infrastructure of the Acehnese living on the coast. Since the disaster, the Acehnese rebel movement GAM, which had been fighting for independence against the Indonesian authorities for 29 years, has signed a peace deal (15 August 2005). The perception that the tsunami was punishment for insufficient piety in this proudly Muslim province is partly behind the increased emphasis on the importance of religion post-tsunami. This has been most obvious in the increased implementation of Sharia law, including the introduction of the controversial 'WH' or Syariah police. As homes are being built and people's basic needs are met, the people are also looking to improve the quality of education, increase tourism, and develop responsible, sustainable industry. Well-qualified educators are in high demand in Aceh.

Boats washed ashore near local businesses in down town Aceh, Sumatra following a massive Tsunami that struck the area on 26 December 2004
While parts of the capital Banda Aceh were unscathed, the areas closest to the water, especially the areas of Kampung Jawa and Meuraxa, were completely destroyed. Most of the rest of the western coast of Aceh was severely damaged. Many towns completely disappeared. Other towns on Aceh's west coast hit by the disaster included LhokngaLeupung, Lamno, PatekCalangTeunom, and the island of Simeulue. Affected or destroyed towns on the region's north & east coast were Pidie RegencySamalanga, and Lhokseumawe.

The area was slowly rebuilt after the disaster. The government initially proposed the creation of a two-kilometer buffer zone along low-lying coastal areas within which permanent construction was not permitted. This proposal was unpopular among some local inhabitants and proved impractical in most situations, especially fishing families that are dependent on living near to the sea.

The Indonesian government set up a special agency for Aceh reconstruction, the Badan Rehabilitasi dan Rekonstruksi (BRR) headed byKuntoro Mangkusubroto, a former Indonesian Minister. This agency had ministry level of authority and incorporated officials, professionals and community leaders from all backgrounds. Most of the reconstruction work was performed by local people using a mix of traditional methods and partial prefabricated structures, with funding coming from many international organizations and individuals, governments, and the people themselves.

The Government of Indonesia estimated in their Preliminary Damage and Losses Assessment that damages amounted to US$4.5 billion (before inflation, and US$6.2 billion including inflation). Three years after the tsunami, reconstruction was still ongoing. The World Bank monitored funding for reconstruction in Aceh and reported that US$7.7 billion had been earmarked for the reconstruction whilst at June 2007 US$5.8 billion had been allocated to specific reconstruction projects, of which US$3.4 billion had actually been spent (58%). (encyclopedia)

In 2009, the government opened a US$5.6 million museum to commemorate the tsunami with photographs, stories, and a simulation of the earthquake that triggered the tsunami.
On 11 April 2012. a Magnitude 8.7 earthquake struck in the Aceh, and tsunami warnings were issued to 28 countries.